Wednesday 29 October 2025
Home      All news      Contact us      RSS     
newzimbabwe - 11 hours ago

“Circuit breaker supplying load tripped” – Parliament in damage control after blackout during Mnangagwa’s SONA

By Anna Chibamu Preliminary investigations have revealed that a circuit breaker supplying the load tripped, causing a power outage at the new Parliament Building during President Emmerson Mnangagwa’s State of the Nation Address (SONA), Parliament has said. The unexpected blackout forced Mnangagwa to complete his address using torchlight before electricity was restored approximately ten minutes later. The post “Circuit breaker supplying load tripped”  Parliament in damage control after blackout during Mnangagwa s SONA appeared first on NewZimbabwe.com.


Latest News
Hashtags:   

“Circuit

 | 

breaker

 | 

supplying

 | 

tripped” –

 | 

Parliament

 | 

damage

 | 

control

 | 

after

 | 

blackout

 | 

during

 | 

Mnangagwa

 | 

Sources